The 340,900-SF campus consists of a three-level main manufacturing building with an enclosed link to a two-level laboratory and office building with cafeteria. There are separate support buildings which include a warehouse, central utilities building, chemical storage building, and two guardhouses.
Overview
PMA Role
PMA developed the detailed schedule for startup and FDA licensing. PMA was also serving as liaison between multiple parties including the owner and project managers.